The water challenge on a construction site

An excavation has to be dry by a fixed date, and the water pumped out of it rarely meets the limits for discharge into a sewer or a watercourse. It carries fines, sometimes iron and manganese, sometimes an old contamination from the ground, and it arrives in volumes that change with the weather.

At the same time the site needs clean water: for concrete, for drilling, for cleaning and for site facilities. Both tasks run only as long as the works do, which makes buying a plant the wrong answer in most cases.

What RIEFILT supplies for construction and tunnelling

We source containerized and mobile treatment units for rental for the duration of the works. We are manufacturer-independent, so the unit is selected for your water and your site, and purchase remains possible where a site runs for years.

  • Rental for the duration of the works, with the option to extend
  • Purchase for long running sites and for contractors with recurring needs, see equipment brokerage
  • Advisory before the tender, so the water concept is in the bid rather than a surprise later, see technical advisory

Typical units and water qualities

  • Sedimentation and lamella separators for fines from excavation water
  • Filtration and precipitation for iron and manganese
  • Activated carbon stages where an old contamination is present
  • pH correction before discharge, especially with concrete contact water
  • Ultrafiltration or reverse osmosis where process water is needed on site
  • Tanks, pumps and dosing as a complete package

Key applications

  • Dewatering of excavations and foundation works
  • Tunnelling water and drilling water
  • Concrete contact water and washout water
  • Treatment before discharge into sewer or watercourse
  • Clean water supply for site facilities

What these projects usually hinge on

  • The discharge permit. The limits set by the authority decide the treatment, and they differ between a sewer and a watercourse.
  • Volume swings. Rain and groundwater levels change the flow, so a buffer is usually part of the concept.
  • The schedule. A dewatering plant that arrives late holds up every trade behind it.

Frequently asked questions

How long can we rent a unit for?

From a few weeks to the full duration of the works. Tell us the period and we check availability for that window.

We do not know the water values yet. Can you still help?

Yes. Describe the ground, the expected volume and where the water has to go. The water assessment is the quickest first step.

Do you also take the plant back at the end?

With a rental the unit is collected again at the end of the agreed period.

Next step

Tell us the site, the expected volume per day, the discharge point and the period. Use the contact page or the water assessment. Related sector: emergency and temporary supply.

Why RIEFILT for this sector

RIEFILT is manufacturer-independent. We match the water treatment technology to your requirements, not to a brand, and supply it as purchase, rental or BOOT. With rental or BOOT you pay for use instead of investing in the plant.

3
Models: BOOT, Rental, Purchase
15+
Years Experience
24 h
Reply to enquiries